SESSIONS

Fire-Fighting Water Demand for Emerging Hazards on Renewable Energy Projects in Australia

Renewable energy projects, wind farms and battery energy storage systems, introduce unique fire hazards that challenge conventional fire suppression strategies and fire water demand planning. This presentation will review these challenges, evaluate current fire‑fighting strategies, and demonstrate how Australian Standards underpin best‑practice fire‑engineering solutions.

PRESENTER(S)
Jack_Tetley_Photo

Jack Tetley

Fire Safety Engineer, Lote Consulting

Jack is a Fire Safety Engineer with recent experience working on an array of projects involving Dangerous Goods and Lithium-ion Batteries including grid scale BESS projects and residential carparks. This includes assisting international manufacturers with confirming that their fire safety system designs are suitable for use in Australia.

Jack has a keen interest in emerging risks such as Energy Storage Systems, Solar Plants, Windfarms Lithium-ion Batteries and Hydrogen technology. He is not only involved in the preparation of Performance Solutions but detailed risk assessments focusing on occupant life safety and fire brigade intervention while also considering business continuity.

Registrations closing soon 

Limited tickets remain for Australia’s largest fire protection conference. Conference sessions, networking and a free tradeshow included.

FIRE AUSTRALIA 2026 TICKETS NOW AVAILABLE

EARLY BIRD REGISTRATION NOW OPEN!